Skip to main content

Accessory Dwelling Units

ADU Builders in Tarzana

Permitted ADUs, garage conversions and junior ADUs. Detached or two-story, 400–1,200 sq ft designed and built across Tarzana and across the San Fernando Valley

★★★★★ 4.9 from 60 Google reviews

ADU builders and garage-conversion specialists in Tarzana and the Los Angeles area. An accessory dwelling unit is one of the smartest ways to add space to your property: house a growing family, give aging parents their own place, generate rental income, or add long-term value without ever moving.

We design and permit every type of ADU (Accessory Dwelling Units), detached backyard cottages, garage conversions, junior ADUs and two-story units from 400 to 1,200 sq ft throughout Tarzana and the wider San Fernando Valley. Each one is fully permitted, structurally engineered, and finished to match your existing home so it looks like it was always part of the property.

One in-house team runs the whole build, from site survey and design through permits, utility runs, framing, finishes and final inspection. See our six-step process.

At a glance

Cost

$75,000 to $400,000

Conversions at the low end, detached builds at the top

Timeline

12 to 20 weeks

Construction time, once permits issue

Permits

Handled in-house

Plan check through final inspection

License

CSLB #979219

General Building contractor. Verify license at CSLB

What we build

Building new

A standalone unit put up from a foundation up, anywhere the lot allows it. The most expensive route and the one with no constraints from the existing house.

  • Detached units from 400 to 1,200 square feet
  • Two-story builds where lot coverage is tight
  • Utility trenching for water, sewer, gas and electrical
  • Own entry, own address, own outdoor space

What we build

Converting what is there

Reusing a structure that already stands. The slab, walls and roof are done, so the money goes into making the space livable and permitted.

  • Garage conversions on the existing slab
  • JADUs carved from the primary home
  • New insulation, plumbing, electrical and egress windows
  • Usually the lowest cost per square foot

Our process

We handle the full path: design and structural engineering, City of LA or county permitting, foundation, framing, MEP rough-in, drywall, finish carpentry and final inspections. Typical timeline once permits issue is 12 to 20 weeks, from breaking ground to final inspection.

What’s Included in an ADU Build?

An ADU is a complete home on the same lot as yours, so it needs what a house needs: a structure, a kitchen, a bathroom, its own entry, and a connection to water, sewer and power. It goes by many names, including granny flat, backyard cottage, casita and in-law unit.

How much of that is new depends on the type. A detached unit builds all of it from the ground up, while a garage conversion or junior ADU reuses a structure that already stands. Here is what each part involves and what it typically costs.

Jump to: Checklist · Costs · What Changes With the Type of ADU

ADU checklist

  • Plans and site: floor plan, survey, soils report where needed, plan check
  • Structure: foundation, framing and roof for a detached or attached ADU, or the existing slab and walls for a garage conversion
  • Utilities: trenches for sewer, water, electrical and gas where used, and a sewer ejector pump on uphill runs
  • Entry and windows: a private entry and an emergency escape opening, usually an egress window, in every bedroom
  • Kitchen and laundry: a full kitchen, or an efficiency kitchen in a junior ADU, plus a spot for a stackable washer and dryer
  • Bathroom: a full bathroom, or a shared one in a junior ADU
  • Systems: a ductless mini-split, a tankless or heat pump water heater, circuits and often a subpanel
  • Energy: insulation to Title 24 and solar panels on most new detached units

Floor plans: studio, 1 bedroom and 2 bedroom ADUs

The floor plan starts with what the unit is for. A studio ADU or 1 bedroom ADU suits a single renter or a parent, while a 2 bedroom ADU works for a small family.

Under state law, a city cannot set its maximum ADU size below 850 square feet, or below 1,000 square feet for a unit with more than one bedroom. Garage conversions are not subject to a size limit. Size also sets fees, so the plan is drawn with the 500 and 750 square foot fee thresholds in mind.

Site work, survey and utility runs

A detached ADU often starts with a survey to confirm setbacks, and sometimes a soils report for the foundation. Then come the utility runs: trenches for the sewer, water, gas and electrical lines from the main house or the street.

Distance drives this cost. A unit at the back of a deep lot needs longer trenches, and a sewer line that runs uphill can need a sewer ejector pump to lift waste to the main line.

Foundation and structure

A new detached unit gets its own foundation, framing and roof. A garage conversion keeps the existing slab, walls and roof, but the slab is checked, the garage door opening is framed in as a wall, and the walls are insulated.

A two-story ADU, including an ADU over a garage, adds stairs, more structural framing and fire separation, which raises the cost per square foot. An attached ADU shares a wall or floor with the main house and typically needs a fire-rated separation between the two.

Entry, windows and doors

Every ADU has its own entry. Bedrooms need emergency escape openings that meet the building code, which is why a garage conversion usually needs new egress windows in the bedrooms.

One project in the recent work below shows exactly that: a garage converted to a permitted unit with a full kitchen, a private entry and new egress windows.

Kitchen

A full ADU needs a complete kitchen with permanent cooking facilities. A junior ADU can use an efficiency kitchen with a cooking appliance, a prep counter and storage.

Compact layouts, an island where space allows and apartment-size appliances are common.

Most owners also want laundry in the unit. A stackable washer and dryer fits in a closet, and it needs water lines, a drain and either a dryer vent to the outside or a ventless dryer.

Bathroom

A full ADU has its own bathroom, while a junior ADU can share one with the main house. The bathroom adds drain, vent and supply lines tied to the new sewer and water runs.

One ADU bath in the recent work below pairs a walk-in shower with a floating vanity and full-height tile.

Heating, cooling and hot water

Many ADUs get their own heating and cooling, often a ductless mini-split, and their own water heater. Compact equipment suits small units.

A tankless water heater hangs on a wall and heats water on demand, and a gas model needs a gas line and its own vent. A heat pump water heater is electric and uses less power than a standard electric tank, but it needs enough surrounding air space to work well, which can be tight in a small unit.

Electrical, meters and solar

The ADU needs its own circuits, and many older Valley homes need a panel upgrade to carry a second kitchen and new heating and cooling. LADWP allows an ADU to share the main home’s electric meter, so a separate meter is optional.

Under California’s 2025 Energy Code, which took effect January 1, 2026, a newly built detached ADU needs solar panels unless an exception applies. Attached units and conversions do not.

Insulation, drywall and finishes

The walls and ceiling are insulated to meet the Title 24 energy calculations in the plans, then closed with drywall. Flooring, doors, trim, paint and fixtures finish the unit.

For a guest suite or a family member, owners often match the main house.

Prefab and modular ADUs

A prefab or modular ADU is built in a factory and set on the lot. It still needs a foundation, utility trenches, permits and inspections on site, so the site work above applies either way.

What Does Each Part of an ADU Cost?

The tables below show national cost ranges for each part, from the lowest to the highest figure published by national cost guides. Each range is wide because it spans everything from a short, simple run to a long or complex one. Full project totals depend heavily on size and type, so they are covered in our size guide.

Unit and site costs

4 items
Part of the ADUNational cost rangeSources
Garage conversion to an ADU$20,000 to $73,200HomeAdvisor, This Old House
Boundary survey$200 to $5,500HomeAdvisor, Fixr, This Old House
Soils (geotechnical) report$1,000 to $5,400HomeAdvisor
Trenching, per linear foot$4 to $12Fixr, HomeAdvisor

Utility costs

6 items
Part of the ADUNational cost rangeSources
Sewer line$1,423 to $5,775HomeAdvisor
Sewer ejector pump$850 to $3,500HomeAdvisor
Water line$1,500 to $12,000Fixr
Gas line$120 to $5,000HomeAdvisor, Fixr
Electrical subpanel$400 to $1,750This Old House
Electrical panel upgrade$518 to $4,500HomeAdvisor, Fixr, This Old House

Systems and equipment costs

5 items
Part of the ADUNational cost rangeSources
Solar, per watt installed$2.50 to $3.50HomeAdvisor, Fixr
Mini-split installation, single zone$500 to $5,000HomeAdvisor, This Old House
Mini-split installation, multi-zone$1,400 to $12,000HomeAdvisor, This Old House
Tankless water heater installation$1,406 to $4,500HomeAdvisor, Fixr, This Old House
Heat pump water heater$2,500 to $3,500This Old House

Code and safety costs

2 items
Part of the ADUNational cost rangeSources
Egress window installation, above grade$500 to $4,500Fixr, This Old House
Fire sprinklers, per sq ft (only when the main house requires them)$0.50 to $3HomeAdvisor, Fixr

Ranges as listed by these guides in October 2026. They are national figures, and your lot, scope and finish level move the final number. Our ADUs typically run $75,000 to $400,000, as the cost summary at the top of this page shows.

City plan check, permit, school and impact fees come on top of these numbers. Plan check follows the project’s valuation, and impact and school fees depend on the unit’s size. For project totals by unit size, see our guide to ADU cost by size.

What Changes With the Type of ADU

The type of ADU decides which of the parts above you pay for. This table shows how the scope shifts.

Part of the ADUDetached ADUAttached ADUGarage conversionJunior ADU
SizeMost run 600 to 1,200 sq ftSet by the lot and the main houseSet by the existing garageUp to 500 sq ft
Foundation and structureAll newNew addition that shares a wall or floor with the houseExisting slab, walls and roof reusedInside the main house
KitchenFull kitchenFull kitchenFull kitchenEfficiency kitchen allowed
BathroomIts ownIts ownIts ownCan share with the main house
Utility runsNew trenches to the unitOften shorter runs, since the unit abuts the houseShorter runs where the garage sits near the houseShared with the main house
SolarRequired for new detached units, unless an exception appliesNot requiredNot requiredNot required
Construction time once permits issue12 to 20 weeks12 to 20 weeks12 to 20 weeks (the fastest route to a permitted unit)12 to 20 weeks

Recent projects

ADUs and Garage Conversions

Detached backyard units, two-story builds, garage conversions and units carved from the main house, each with its own kitchen, bath and entry.

Modern Oak ADU
Modern Oak ADUDetached oak-clad backyard cottage with floor-to-ceiling glass and concrete patio
White Plaster Suite ADU
White Plaster Suite ADUDetached stucco ADU with sliding glass wall, bedroom suite and outdoor kitchenette
Garden Cottage ADU
Garden Cottage ADUDetached stucco guest cottage with shed roof framed by drought-tolerant landscaping
Open-Plan ADU Interior
Open-Plan ADU InteriorLight-oak kitchen island and living room under beamed ceiling with steel garden doors
Garage Conversion ADU
Garage Conversion ADUGarage converted to a permitted unit with full kitchen, private entry and new egress windows
ADU Bath Suite
ADU Bath SuiteADU bathroom with walk-in shower, floating vanity and full-height tile

Free estimate

Planning an ADU? Get a free estimate from our Tarzana team.

What ADU clients say

Rated 4.9 out of 5 across 60 Google reviews, with 42 more on Yelp.

★★★★★

“Our project manager, Danny, truly went above and beyond in overseeing the construction of our new Accessory Dwelling Unit (ADU). His attention to detail and unwavering commitment resulted in the flawless realization of our vision.”

Ron Woods
verified Facebook review
★★★★★

“Master In Design just completed my 600sq ft ADU (1 bedroom unit). I met with over 10 contractors before I chose to work with them.”

John A.
verified Yelp review
★★★★★

“Barak arrived well prepared with copies of the company’s license and permits and all required paperwork.”

Michal R.
verified Yelp review
Avi "Danny" Vaknin, owner of Master in Design

Who runs your project

Avi “Danny” Vaknin, owner

Avi Vaknin owns Master in Design, the Tarzana design-build firm serving the San Fernando Valley since 2012. Most clients know him as Danny.

Reviews describe him on site during the build and back at the house when something needs attention, sometimes years after the job is done. Homeowners who built ADUs with us mention him overseeing the construction himself.

About Master in Design

ADU FAQs

What homeowners ask before building an accessory dwelling unit in Tarzana and LA.

What's the difference between an ADU and a room addition?
An ADU (Accessory Dwelling Unit) is a permitted, self-contained living unit with its own kitchen, bath and entry, used for family, rental income, or a home office. A room addition expands the existing home (master suite, second story, bump-out). We build both.
How long does an ADU take in Los Angeles?
Most ADUs run 12 to 20 weeks from permit-ready to final inspection. That is construction time, once permits issue. City plan-check timing is the biggest variable before that clock starts.
What does an ADU cost in Tarzana?
An ADU in Tarzana costs $75,000 to $400,000. The final number depends on square footage, finish level, foundation type and whether the unit is a garage conversion or new construction. Conversions usually land near the low end, and detached new builds near the top. We give a written line-item estimate after the design phase, so there are no surprises.
Do I need an architect?
For most ADUs we cover the design in-house and bring in a licensed architect / structural engineer where the city plan-check requires stamped drawings. Either way it's coordinated through us.
Can I rent out my ADU?
Yes. That's one of the most common reasons homeowners build one. Because an ADU is self-contained with its own kitchen, bath and private entry, it can be rented as a long-term unit, while local rules govern short-term rentals. We design the layout and utilities with rental use in mind from day one.
What type of ADU is the cheapest?
The cheapest type of ADU is usually a junior ADU or a garage conversion, because both reuse a structure that already stands. A junior ADU is carved out of the main house, up to 500 square feet, and can share a bathroom. A garage conversion reuses the slab, walls and roof, so the budget goes into insulation, plumbing, electrical and a kitchen. A detached ADU costs the most because it needs its own foundation, roof and utility runs.
What's one drawback of an ADU?
One drawback of an ADU is the upfront cost, since even a garage conversion is a real construction project with plans, permits and inspections. A detached unit also takes yard space you may not get back, and trenching new water, sewer and power lines disrupts the lot during the build. If you rent the unit out, you also take on the work of being a landlord. Most owners weigh these against the long-term rent or family housing the ADU provides.
Does adding an ADU increase property taxes in Los Angeles?
Yes, adding an ADU increases property taxes in Los Angeles, but only on the new construction. Under California's Proposition 13 rules, the county assessor adds the value of the ADU to your tax base and leaves the assessed value of your existing home unchanged. The tax on the new unit is roughly 1 percent of its assessed value, plus local charges. A garage conversion usually adds less than a detached unit, because it creates less new value.
Does an ADU need a kitchen in California?
Yes, an ADU needs a kitchen in California, because state law defines it as a complete, independent home with permanent space for living, sleeping, cooking and sanitation. A junior ADU has lighter rules. It needs an efficiency kitchen with a cooking appliance, a prep counter and storage, but it can share a bathroom with the main house. That kitchen requirement is a big part of why an ADU can be rented as its own unit.
How much does it cost to convert a garage into an ADU in Los Angeles?
The cost to convert a garage into an ADU in Los Angeles depends mostly on what the garage already has. Our ADU projects run $75,000 to $400,000, and a conversion usually sits near the low end of that range, because the slab, walls and roof are reused. The price rises when the slab needs repair, when plumbing has to run a long way from the house, or when the garage needs new egress windows and more insulation.
What are the common mistakes when building an ADU?
The most common mistakes when building an ADU are budgeting before the utility runs are known, assuming a garage is ready to convert, and overlooking the panel and solar requirements. A long or uphill sewer run adds trenching and can need a pump. An old garage slab may need repair before it can carry a living space, and bedrooms need code-compliant egress windows. Many older homes need a panel upgrade for a second kitchen, and a newly built detached unit needs solar unless an exception applies.
Recent Work

Built. Finished. Loved.

Recent projects from our Tarzana design-build team. ADU kitchens use the same cabinetry and stone we install in new kitchen designs. Every ADU bath is built to the standard of our bathroom remodels. Some owners build an ADU while they plan full-home remodeling for the main house.

What drives the cost of an ADU in Tarzana?

An ADU in Tarzana runs $75,000 to $400,000. A garage conversion sits at the low end because the slab, walls and roof already exist. A new detached unit of 600 to 1,200 square feet sits at the top, since it needs its own foundation, utility runs and roof.

Four things move the number more than anything else:

  • Whether you are converting an existing structure or building new from a foundation up
  • How far the unit sits from the main house, which sets the trenching for water, sewer, gas and electrical
  • Whether the unit gets its own meters or shares the main house service
  • Finish level, which on a rental unit is usually where the budget gets protected

The types of ADU we build

Detached backyard units

A standalone building with its own foundation, entry and address. Most run 600 to 1,200 square feet with one or two bedrooms. This is the most expensive path and the most flexible, because nothing about the existing house constrains the layout.

Garage conversions

The fastest route to a permitted unit. The slab, walls and roof are already standing, so the work is insulation, plumbing, electrical, egress windows, and a kitchen and bath where none existed. Budget usually lands at the low end.

Junior ADUs

A unit up to 500 square feet carved out of the primary home, with its own entry and an efficiency kitchen. A JADU can share a bathroom with the main house, which is what keeps the cost down.

Two-story ADUs

Where lot coverage will not allow a wide footprint, the unit goes up instead. Stairs, structural framing and fire separation add cost, but a second floor can put a full two-bedroom unit on a lot that would otherwise cap out at a studio.

ADU permits and the California rules that matter

State law is the reason these units get approved when other projects stall. Cities work to a 60-day clock on a complete application, and units up to 1,200 square feet are allowed on most residential lots.

What that means on a Tarzana lot:

  • Plan check runs through LADBS for most of the San Fernando Valley
  • Title 24 energy compliance and CALGreen apply to the new unit
  • Setback and lot coverage rules decide whether you go detached, attached or up
  • Utility metering is a decision, not a requirement, and it affects both cost and how you can rent the unit later

For setbacks, size limits and the full permit checklist, see our guide to Los Angeles ADU requirements.

Avi “Danny” Vaknin, who owns Master in Design, keeps the permit path in-house, so plan check corrections come back to us rather than to you.

Outside the City of Los Angeles, each city runs its own plan check. We also work as ADU builders in Thousand Oaks. The same team handles ADU projects in Simi Valley, from permits to final inspection.

What controls the ADU timeline?

Construction takes 12 to 20 weeks once permits issue. That runs from breaking ground to final inspection.

Plan check is the part nobody can schedule. The city works to a 60-day clock on a complete application, and the word complete is doing real work in that sentence. A clean submittal moves. One missing sheet restarts it.

When a room addition is the better choice

Sometimes the better answer is not a separate unit at all. If what you need is a bigger primary bedroom, or a family room that opens off the kitchen, a room addition gets you there for less money and in less time, because it reuses the existing foundation, roof and utilities.

Go with a standalone unit when you need a separate entry, a second kitchen, a unit you can rent, or somewhere a family member can live independently on the same lot.

Ready to start your project?

Tell us about it. No obligation, no pressure. We respond within one business day.

★★★★★
4.9 out of 5 from 60 Google reviews, plus 42 reviews on Yelp.
Licensed General Building contractor, CSLB #979219. Serving Tarzana and the San Fernando Valley.

Every ADU we build is permitted through LADBS (or your local jurisdiction), with Master in Design managing the full process. Title 24, CALGreen, and structural plans are all in scope.