Skip to main content

Spa-Style Baths

Bathroom Remodeling in Tarzana

Master baths, powder rooms and full bathroom renovations across Tarzana and the greater Los Angeles area.
Spa-style bathroom remodeling in Tarzana and Los Angeles. From master-bath gut renovations to compact powder-room refreshes, our bathrooms combine luxury materials (honed travertine, brushed brass, frameless glass, freestanding tubs) with the layouts and waterproofing that make them last.
One in-house team handles tile setting, plumbing, electrical, vanity carpentry, glass and finish work, so the rough-ins match the fixtures and the grout lines match the floor. Every wet wall and shower pan is membrane-waterproofed, with no exceptions, because the most expensive callback in this trade is bad waterproofing.

We design and build bathrooms for homeowners across Tarzana, Encino, Woodland Hills, Sherman Oaks, Calabasas and the wider LA area, all on our six-step design-build process. Planning a project? See how long a bathroom remodel takes.

At a glance

Cost

$25,000 to $100,000

Where most of our master baths land

Timeline

3 to 12 weeks

Powder rooms 3 to 4, spa-style baths up to 12

Permits

Handled in-house

Permits and inspections coordinated for you

License

CSLB #979219

General Building contractor. Verify license at CSLB

What we build

Spa-style master baths

Full master-bath renovations: walk-in showers, freestanding soaking tubs, double vanities and statement lighting, designed to feel like a private hotel suite.

  • Curbless walk-in showers with linear drains
  • Freestanding tubs in marble, quartz or stone
  • Double vanities with integrated lighting
  • Heated floors and steam-ready showers
What we build

Guest, hall & powder baths

Quick-impact refreshes and full remodels for secondary bathrooms (powder rooms, kids’ baths and guest baths) that punch above their square footage.

  • Wall-hung vanities with backlit mirrors
  • Custom tile installations and feature walls
  • Compact tub-shower combos with built-in storage
  • Powder rooms with statement wallpaper and millwork
Our process

We handle layout design, demolition, waterproofing, tile, plumbing, electrical and finish carpentry. Typical timeline: 3–4 weeks for a powder or guest bath and 5 to 9 weeks for a full master bath. Spa-style baths with steam, heated floors and complex tile work run 10–12 weeks.

Recent baths

Bathroom Renovations

A cross-section of recent master and guest bathroom projects across Tarzana and the greater LA area.

Travertine Spa Master
Travertine Spa MasterTravertine wet wall, drop-in soaking tub behind glass, oak vanity with dual vessel sinks
Marble & Oak Master
Marble & Oak MasterCurbless marble-tile shower, freestanding tub with brass floor-mount filler, oak double vanity
Roll-Top Tub Master
Roll-Top Tub MasterFreestanding roll-top tub on brass feet, oak vanity with vessel sinks, glass shower
Sunlit Stone Master
Sunlit Stone MasterCorner glass shower in beige stone, freestanding tub under window, oak vanity with brass mirror
Hillside-View Master
Hillside-View MasterOak vanity with glass counter, freestanding tub by hillside window, brass ladder warmer
Warm Minimal Spa
Warm Minimal SpaTravertine accent wall, freestanding tub, oak floating vanity, brass wall-mount faucet

Free estimate

Planning a bathroom remodel? Get a free estimate from our Tarzana team.

What bathroom clients say

Rated 4.9 out of 5 across 60 Google reviews, with 42 more on Yelp.

★★★★★

“Danny and crews were very dependable and did exceptional work remodeling two bathrooms in an older track home. They were timely and trustworthy (I left a lockbox for them to enter and work on my house while I was away at work).”

David Velazquez
verified Google review
★★★★★

“I am very particular and detail-oriented and the work done by his sub-contractors- plumbers, electricians and tile guys was very high quality.”

Jordan G.
verified Yelp review
★★★★★

“Our downstairs bathroom looks fantastic! I asked that the old porcelain tile be retained, and the team from Master in Design worked around it to create a truly inviting personal space!”

Sandra Haynes
verified Google review
Avi "Danny" Vaknin, owner of Master in Design

Who runs your project

Avi “Danny” Vaknin, owner

Avi Vaknin owns Master in Design, the Tarzana design-build firm serving the San Fernando Valley since 2012. Most clients know him as Danny.

Reviews describe him on site during the build and back at the house when something needs attention, sometimes years after the job is done.

About Master in Design

Bathroom Remodeling FAQs

What Tarzana and LA homeowners want to know before they remodel a bath.

How long does a bathroom remodel take?
A standard master-bath remodel runs 5–9 weeks. Powder rooms are usually 3–4 weeks. Spa-style baths with steam, heated floors and complex tile work can run 10–12 weeks. You get a written schedule before demo day.
What does a bathroom remodel cost in Tarzana?
Most of our master baths land between $25,000 and $100,000. Material choices drive the spread: natural stone vs porcelain tile, freestanding tub, custom shower glass and plumbing brand. We itemize every line so trade-offs are visible.
Can you do walk-in showers without curbs?
Yes, curbless walk-in showers are one of our most-requested upgrades. We slope the substrate, waterproof correctly and install linear drains so the floor flows continuously from the bath into the shower.
Do you waterproof under the tile?
Always. We membrane-waterproof every wet wall and pan, regardless of jurisdiction requirements. Failed waterproofing is the most expensive callback in this trade and we will not skip it.
Do I need a permit for a bathroom remodel?
Plumbing, electrical and structural changes require permits. Cosmetic-only refreshes (paint, fixtures, vanity swap) often do not. We pull every permit your scope needs and schedule inspections so the project signs off cleanly.
What is the most expensive part of a bathroom remodel?
The most expensive part of a bathroom remodel is usually the shower. Tile, waterproofing, custom glass and valves add up quickly, and moving the drain or toilet adds plumbing and permit work. Stone tile and a freestanding tub also push the cost up. Labor is a large share too, because tile setting and waterproofing take skilled hands and time. Keeping the plumbing in place is the best way to control the budget.
What to avoid when renovating a bathroom?
When renovating a bathroom, avoid skipping waterproofing, installing a weak exhaust fan and picking tile before you plan the layout. Other common mistakes are too little storage, one overhead light, glossy floor tile that gets slippery and a vanity that blocks the door. Order fixtures early too, since a backordered valve or vanity can stall the job for weeks.
In what order should I renovate a bathroom?
You should renovate a bathroom in this order: plan the layout and pick fixtures, get the permit, then demolish. Plumbing and electrical rough-in come next, followed by the inspection, backer board and a waterproof membrane. Tile goes in after the membrane is tested. Then the vanity, toilet, fixtures and shower glass are installed, and paint, mirrors and accessories finish the job. Glass is measured last, after the tile is set.
What makes a bathroom look outdated?
A bathroom looks outdated when it has a tub and shower combo with a curtain, beige or speckled tile, a cultured marble vanity top, shiny 1990s brass or a single light bar over the mirror. Small tiles with wide grout lines date a room quickly too. A walk-in shower with frameless glass, larger tiles, a floating vanity and warm, layered lighting makes the same space feel current.
Recent Work

Built. Finished. Loved.

Recent bathrooms and more from our Tarzana team. Bathroom clients often schedule kitchen remodels for the same crew and permit. If there is no room for the bath you want, primary suite additions create it. Larger projects turn into full-home remodeling work.

Ready to start your project?

Tell us about it. No obligation, no pressure. We respond within one business day.

★★★★★
4.9 out of 5 from 60 Google reviews, plus 42 reviews on Yelp.
Licensed General Building contractor, CSLB #979219. Serving Tarzana and the San Fernando Valley.

A master bathroom remodel in Tarzana and the surrounding valley typically runs 5 to 9 weeks from demo to walkthrough. Permits, glazing inspection, ventilation upgrades and waterproofing are all coordinated under one Master in Design schedule.

Spa-style master bathroom remodel with travertine walls and freestanding tub in Tarzana, CA