Skip to main content

Custom Homes & New Construction

Custom Home Builder & New Construction in Tarzana

Ground-up custom homes, tear-down rebuilds and wildfire rebuilds. Designed, permitted and built by one licensed team across Los Angeles and the San Fernando Valley.

★★★★★ 4.9 from 60 Google reviews

Custom home builders based in Tarzana, building across Los Angeles and the San Fernando Valley. A new house is the one project where nothing about an old floor plan holds you back. You choose the layout, the light, the ceiling heights and how the home sits on the lot.

Master in Design builds custom homes and handles new construction on empty lots and cleared sites. That includes tearing down a house that no longer works, building the one you want in its place, and rebuilding homes lost to wildfire. Our custom home builders work across Tarzana, Encino, Sherman Oaks, Woodland Hills, Calabasas and Studio City, and throughout the San Fernando Valley.

As a design-build firm in Los Angeles, one team coordinates design, structural engineering, permits, the build and final inspection. See how that works in our design-build process.

What Does a Custom Home Builder in Los Angeles Do?

A custom home builder in Los Angeles takes a house from plans to keys on your lot. Custom home construction covers design coordination, structural engineering, permits, site work, foundation, framing, systems, finishes and final inspection. Published construction costs for Los Angeles custom homes run from $300 to more than $1,000 per square foot, depending on design, site and finish level.

At a glance

Cost

$300 to $1,000+ per sq ft

Published LA construction ranges, before land and design fees

Timeline

12 to 18 months

Construction time, once permits issue. Design and permits come first

Permits

Handled in-house

Plan check through final inspection

License

CSLB #979219

General Building contractor. Verify license at CSLB

What we build

Custom homes

A luxury custom home or a simple family house, designed around how you live, on a lot you own or are buying.

  • Single-story and two-story homes
  • Hillside home builds and flat lots
  • Your architect's plans, or design-build with our team
  • Finish selections with our in-house designers

What we build

New construction

Ground-up building on a cleared site, whether the lot is empty, the old house is coming down, or a fire took it.

  • Empty-lot builds from grading up
  • Tear-down and rebuild of an existing house
  • Wildfire rebuilds
  • Grading, utility and sewer connections

Our process

We coordinate the full path: architectural and structural plans, survey and soils report, plan check with LADBS or your local city, demolition, grading, foundation, framing, mechanical, electrical and plumbing rough-in, inspections, finishes and final sign-off.

What’s Included in Building a Custom Home?

Building a custom home means paying for every part of the house at once: the site work, the structure, the systems inside the walls and every finish you touch. Everything is new, so every part is a line item in the budget.

The stages below roughly follow how a house comes together, and they use the same groupings the National Association of Home Builders (NAHB) uses for construction costs. Here is what each stage covers, and how the national construction cost splits between them.

Jump to: Checklist · Costs

Building a house checklist

  • Design and approvals: custom home design and floor plans, structural engineering, Title 24 energy calculations, survey, soils report, plan check and permit fees
  • Site work: demolition of an existing house, lot clearing, grading, retaining walls, utility trenches
  • Foundation: a slab, raised foundation, or piers and caissons on hillside lots
  • Framing: floors, walls, roof trusses and sheathing
  • Exterior: roofing, windows and doors, stucco or siding
  • Major systems: plumbing rough-in, electrical rough-in, HVAC and solar
  • Interior: insulation, drywall, cabinets and countertops, flooring, fixtures, appliances, lighting, trim and paint
  • Final steps: driveway, landscaping, final inspection and the certificate of occupancy

Plans, engineering and permits

Custom home design starts with the floor plan: how many bedrooms, where the kitchen sits, and how the house faces the sun and the street. The plans then go through structural engineering and Title 24 energy calculations.

Most lots also need a survey and a soils report before the foundation can be designed. The city reviews the full set in plan check, and permit, school and utility fees are paid before the permit issues.

Site work

Site work gets the lot ready to build on. It can include demolishing an existing house, clearing the lot, grading, and trenching for water, sewer, gas and electrical connections. Hillside lots add retaining walls and more grading, so site work can differ a lot from one lot to the next.

Foundation

The foundation is designed from the soils report. Flat Valley lots often use a concrete slab or a raised foundation, while hillside lots can need deep piers or caissons to reach stable ground.

Framing

Framing builds the floors, walls and roof structure, including the sheathing and the beams that carry open floor plans and tall ceilings. Extra corners, roof lines and cantilevers all add framing time and material.

Exterior finishes

Exterior work closes the house in against the weather: roofing, windows, exterior doors, and stucco or siding. It overlaps with the systems rough-in once the frame is up. Custom windows can have long lead times, so they are usually ordered well before framing ends.

Major systems

The plumbing rough-in and electrical rough-in run pipes and wiring through the open walls, and HVAC ducts go in at the same stage, each with its own inspection. California’s energy code (Title 24) also requires solar panels on most newly built single-family homes. NAHB’s national table has no separate solar line, so ask where solar sits in any quote.

Interior finishes

Interior finishes are where a custom home becomes yours: insulation, drywall, cabinets, countertops, flooring, tile, plumbing fixtures, lighting, appliances, doors, trim and paint. Interior finishes are also the largest share of national construction cost, so finish level is one of the biggest levers on a budget.

Final steps

The last stage covers landscaping, the driveway and walkways, final cleanup, and the final inspection. The house can be lived in once the city issues the certificate of occupancy, its sign-off that the finished home was built to code and the approved plans. Buyers and lenders ask for it when the home is sold or refinanced, so it stays with the house records.

How a New Home’s Construction Cost Breaks Down

NAHB surveys builders on what a typical new single-family home costs to build, stage by stage. Its 2024 survey, published in January 2025, puts the average construction cost at $428,215 for a 2,647 square foot home, or about $162 per square foot. Here is how that cost splits across the stages above.

StageWhat it coversShare of construction costNational average cost
Site workPermit, impact, water and sewer fees, architecture and engineering7.6%$32,719
FoundationsExcavation, foundation, concrete, retaining walls and backfill10.5%$44,748
FramingFraming and roof structure, trusses and sheathing16.6%$70,982
Exterior finishesExterior walls, roofing, windows and doors13.4%$57,510
Major systemsPlumbing, electrical and HVAC, before fixtures19.2%$82,319
Interior finishesCabinets, countertops, flooring, drywall, trim, paint, fixtures, appliances, insulation and lighting24.1%$103,391
Final stepsDriveway, landscaping, outdoor structures and cleanup6.5%$27,710
OtherItems outside the stages above2.1%$8,835
Total100%$428,215

Source: NAHB Cost of Constructing a Home, 2024 survey. These are national averages for a typical new single-family home, and NAHB notes the survey is not a perfect tool for estimating the cost of a particular house in a particular location. Land sits outside these figures.

NAHB’s Site Work stage covers permit and utility fees plus architecture and engineering, which matches Plans, engineering and permits above. Excavation and retaining walls are counted under Foundations.

Los Angeles quotes run higher. Published construction costs for custom homes here run from about $300 to more than $1,000 per square foot, as the cost summary at the top of this page shows. What each quote includes varies, and land is extra. Hillside site work and custom finishes help explain the high end. The cost section below explains why the published figures vary so widely.

The groups below break each stage into NAHB’s line items, using the same 2024 survey. Small “Other” lines under $1,000 are left out of the framing, exterior, systems, interior and final step tables, so those rows add up to slightly less than the stage totals. NAHB counts trusses and sheathing separately only when they are not already included in the framing line.

Site work and foundation line items

7 items
Line itemNational average costShare of construction cost
Building permit fees$7,6401.8%
Impact fees$6,3671.5%
Water and sewer fees, inspections$6,2601.5%
Architecture and engineering$6,4801.5%
Other site work$5,9721.4%
Excavation, foundation, concrete, retaining walls and backfill$43,00210.0%
Other foundation work$1,7470.4%

Framing and exterior line items

7 items
Line itemNational average costShare of construction cost
Framing, including roof$49,76311.6%
Trusses$12,9033.0%
Sheathing$6,5131.5%
Metal and steel$1,7180.4%
Exterior wall finish$24,4505.7%
Roofing$16,7323.9%
Windows and doors, including the garage door$15,9903.7%

Major systems line items

3 items
Line itemNational average costShare of construction cost
Plumbing, except fixtures$27,1806.3%
Electrical, except fixtures$27,3836.4%
HVAC$26,9386.3%

Interior finish line items

10 items
Line itemNational average costShare of construction cost
Cabinets and countertops$19,0564.5%
Flooring$15,3883.6%
Drywall$13,9623.3%
Interior trim, doors and mirrors$12,9203.0%
Painting$11,1502.6%
Plumbing fixtures$7,9221.9%
Appliances$7,4991.8%
Insulation$6,9921.6%
Lighting$5,3921.3%
Fireplace$2,3780.6%

Final step line items

4 items
Line itemNational average costShare of construction cost
Driveway$9,6352.3%
Landscaping$9,2692.2%
Outdoor structures$4,7221.1%
Cleanup$3,1830.7%

Lot preparation costs

8 items
Part of the projectNational cost rangeSources
House demolition, whole house$3,000 to $45,000 (typical $6,000 to $25,000)Fixr, HomeAdvisor
House demolition, per sq ft$3 to $17HomeAdvisor, Fixr
Lot clearing$250 to $15,000HomeAdvisor, Fixr
Retaining wall$3,191 to $10,000HomeAdvisor, Fixr
Retaining wall, per sq ft installed$10 to $75Fixr
Boundary survey$200 to $5,500HomeAdvisor, Fixr, This Old House
Topographic survey$500 to $6,500HomeAdvisor, Fixr, This Old House
Soils (geotechnical) report$1,000 to $5,400HomeAdvisor

The lot preparation figures come from national cost guides rather than the NAHB survey, checked in October 2026. Each range runs from the lowest to the highest figure the guides publish, and some guides give typical ranges while others give extremes, so a real quote can land outside it. Retaining walls are already counted inside NAHB’s foundation line above, so do not add the two together. Hillside lots can need more retaining wall and grading than these national ranges reflect.

New Construction in Los Angeles: Three Ways a Project Starts

Every new build begins from one of three places. Each one changes the first few months of the job.

Building on an empty lot

An empty lot starts with a survey and a soils report. Those two documents set the foundation design, the grading, and how large the house can be under the zoning rules.

Tear down and rebuild

Many Valley neighborhoods have good lots under tired 1950s and 1960s houses. When the fix list reaches the foundation, the roof and every system at once, a full rebuild is worth pricing next to the remodel.

A rebuild is also the moment to use more of the lot. Under California's SB 9, many single-family lots can hold two homes, or be split into two lots. Historic districts and Very High Fire Hazard Severity Zones are excluded, and SB 9 applications are currently barred in the Palisades burn area, so we check eligibility before design starts.

Rebuilding after a wildfire

Fire rebuilds follow their own path: debris removal, soil testing, and expedited permits for like-for-like rebuilds through City of LA and LA County programs. We rebuild homes in the hills, canyons and foothills affected by the 2025 fires.

Planning a Pacific Palisades rebuild? Start with our Palisades fire rebuild page. Coastal lots are covered on our Malibu fire rebuild page. For an Altadena rebuild in the Eaton fire area, see our Altadena fire rebuild page.

How Much Does It Cost to Build a Custom Home in Los Angeles?

Published figures for building a house range from about $162 to more than $1,000 per square foot. That spread looks like nobody agrees. In practice, each source measures a different kind of house, in a different place.

SourceWhat it measuresCost per sq ft
NAHB 2024 builder surveyAverage new home nationally, construction costAbout $162
NAHB analysis of Census dataMedian contractor-built custom home, Pacific region, excluding landAbout $167
Opendoor, 2026Average build cost in CaliforniaAbout $225
HomeLight, 2025Custom homes in California$500 or more
Los Angeles builder pages, October 2026Custom homes in Los AngelesAbout $300 to over $1,000

NAHB, Opendoor and HomeLight figures are from their published reports. The Los Angeles range is from builder pages in Google results for Los Angeles, October 2026.

Land sits outside every one of these figures. Architect fees, survey and soils work, permit fees and utility connections may or may not be included, so ask what each quote covers.

For a sense of scale, a 2,500 square foot custom home at $300 to $800 per square foot works out to about $750,000 to $2 million in construction cost.

Four things move the number more than anything else:

  • The site: hillside grading, retaining walls and poor soil add structure you never see
  • Size and shape: extra corners, roof lines and second-story cantilevers add framing and labor
  • Finish level: cabinetry, stone, windows and fixtures can swing the total by hundreds of thousands
  • Utilities and access: sewer runs, power upgrades and tight streets that limit deliveries

We give a written line-item estimate once the design is far enough along to price honestly.

Free estimate

Planning a new home? Get a free estimate from our Tarzana team.

What our clients say

Rated 4.9 out of 5 across 60 Google reviews, with 42 more on Yelp.

★★★★★

“The constant communication and progress updates from the crew were a huge difference, and every inspection passed on the first pass.”

Debby M.
verified Google review
★★★★★

“David proactively kept us up to date by sending pictures throughout the project.”

David F.
verified HomeAdvisor review
★★★★★

“The estimate was reasonable, and they were the only company in Los Angeles that guaranteed their work.”

Rob P.
verified HomeAdvisor review
Avi "Danny" Vaknin, owner of Master in Design

Who runs your project

Avi “Danny” Vaknin, owner

Avi Vaknin owns Master in Design, the Tarzana design-build firm serving the San Fernando Valley since 2012. Most clients know him as Danny.

Reviews describe him on site during the build and back at the house when something needs attention, sometimes years after the job is done.

About Master in Design

How Long Does It Take to Build a Custom Home?

Plan on two clocks. Design and permits usually take 6 to 12 months in Los Angeles, and construction takes about 12 to 18 months once permits issue.

Plan check is the part nobody can schedule. A complete submittal moves. A missing sheet or a soils question sends it back.

Once the permit issues, the build runs in this order:

  1. Demolition or site clearing
  2. Grading and foundation
  3. Framing and roof
  4. Rough plumbing, electrical and HVAC, each with its own inspection
  5. Insulation, drywall, windows and exterior finishes
  6. Interior finishes, final inspection and certificate of occupancy

When Building New Is the Wrong Call

A new house is not always the answer, and we will tell you when it is not.

If the house is sound and you mainly need more room, a room addition or second story keeps the foundation, roof and utilities you already paid for.

If the layout works but everything feels dated, whole-home remodeling gets you new kitchens, baths and finishes for far less than a rebuild.

If the goal is rental income or a place for family, a backyard ADU adds a second home without touching the first.

Build new when the foundation, framing and systems all need replacing, or when no remodel can deliver the house you want.

Custom Home FAQs

What homeowners ask before building a new house in Los Angeles.

How much does it cost to build a 2,000 sq ft house in Los Angeles?
The cost to build a 2,000 sq ft house in Los Angeles is about $600,000 to $1.6 million for construction alone, using the $300 to $800 per square foot range most local builder pages report. A simple single-story design with standard finishes sits near the low end. A two-story custom home with upgraded finishes on a hillside lot sits near the top or above it. Land, design fees, permits and utility connections are extra.
Is it cheaper to buy or build a house in California?
Buying is usually cheaper than building a house in California, at least up front, because construction costs, permit fees and a year or more of carrying costs add up fast. Building wins when you already own the lot, when the existing house needs a full rebuild anyway, or when nothing for sale fits how you live. In Los Angeles, a tear-down and rebuild on land you already own is the most common case where building makes sense.
How long does it take to build a house?
Building a house in Los Angeles takes about 18 months to 2.5 years from the first design meeting to move-in. Design and permits usually take 6 to 12 months, and construction takes about 12 to 18 months once permits issue. Hillside lots, soils problems and plan check corrections add time. A simple single-story home on a flat lot moves faster than a two-story custom home with complex engineering.
What is the cheapest type of house to build?
The cheapest type of house to build is a simple rectangle with a basic roof line on a flat lot. Every extra corner, roof valley and cantilever adds framing and labor. Stacking two stories over one foundation and one roof often costs less per square foot than spreading the same space across a single story. Standard window sizes, stock materials and fewer custom details also keep the budget down.
Is it cheaper to tear down and rebuild or remodel?
Remodeling is usually cheaper than a tear-down and rebuild when the foundation, framing and roof are sound. The math changes when the foundation needs replacing, the house needs new plumbing, electrical and HVAC at the same time, or you want to change most of the layout. At that point you pay to remove and replace most of the house anyway. Price both options at the same square footage and finish level before you decide.
How do you build a custom home?
You build a custom home in two phases: design and permits first, then construction. Start by confirming the lot with a survey, a soils report and a zoning check, then have the plans drawn, engineered and submitted for plan check. Once the permit issues, the build runs from site work and foundation through framing, systems, finishes and final inspection. In Los Angeles, design and permits usually take 6 to 12 months, and construction takes about 12 to 18 months once permits issue.
Recent Work

Built. Finished. Loved.

Recent projects from our Tarzana design-build team. New homes get the same cabinetry and stone we install in kitchen remodels.

Ready to start your project?

Tell us about it. No obligation, no pressure. We respond within one business day.

★★★★★
4.9 out of 5 from 60 Google reviews, plus 42 reviews on Yelp.
Licensed General Building contractor, CSLB #979219. Serving Tarzana and the San Fernando Valley.